Portfolio & pipeline

Three campuses.
3.6 GW of datacenters in the making.

Each campus is being assembled through the stages of the datacenter lifecycle — land control, secured power, anchored tenants — the sequence where acreage becomes a financeable, institutional-grade facility. Detailed deal-level data — including tenant names, financial structures, and stabilized economics — is provided to qualified investors via the data room following accredited-status verification.

Datacenter campuses
3
under development
Datacenter capacity
3.6 GW
3,600 MW combined
Stage
Funding
land acquired
Tenants
2 / 3
confirmed or secured
Project · 01

HPC AI - Site PHI 1

Flagship hyperscale-grade datacenter campus for high-performance AI training workloads. Land acquired, power capacity in place, tenant agreement confirmed — a facility anchored by its contract before the first rack arrives.

Stage
Funding
Capacity
1.8 GW
Tenant
Confirmed
Status
Land Acquired
Project · 02

HPC AI/Bitcoin mining

Flexible-compute datacenter engineered to serve AI inference with the ability to flex into digital-asset workloads — the same powered shell, cooling and interconnection monetized across compute markets and demand cycles.

Stage
Funding
Capacity
500 MW
Tenant
Secured
Status
Land Acquired
Project · 03

HPC AI PH 2

Phase-two expansion campus in the value-creation stages of the datacenter lifecycle: land acquired, entitlements in motion, tenant negotiations underway — the point where secured megawatts convert acreage into a financeable project.

Stage
Funding
Capacity
1.3 GW
Tenant
TBD
Status
Land Acquired

Site imagery is representative of the asset class and is not a photograph of any specific project location. Project details on this page reflect status as of the most recent update; please contact investor relations for current information.

The lifecycle view

Where each campus sits
on the ladder.

A datacenter is assembled in stages — originate, entitle & power, pre-lease, build, operate — each with its own value step-up. The portfolio is concentrated in the stages where that step-up is largest, as laid out in our strategy.

CampusCapacityLifecycle position
HPC AI - Site PHI 11.8 GWLand acquired, tenant confirmed — pre-leased and raising development capital
HPC AI/Bitcoin mining500 MWLand acquired, tenant secured — flexible-compute design, raising development capital
HPC AI PH 21.3 GWLand acquired, entitlements in motion — tenant negotiations underway

Two of three campuses are tenant-anchored before construction — contracts before concrete, the discipline that makes a datacenter financeable in the institutional capital market now forming around the asset class.

Data room

Deal-level materials for qualified investors.

Tenant names, lease economics, capital structure, and underwriting are disclosed only after accredited-investor verification. Submit an inquiry to begin the process.